Meeting demand for data center construction with Touchplan

October 19, 2023

Aerial view of an industrial site with two large warehouse buildings and adjacent parking areas, highlighting the Texas Data Center construction project by Vondace Contracting.

The rise of AI, cloud computing, and work-from-home business is driving increased demand for data center construction. When it comes to constructing data centers, the build-outs for the necessary power, cooling, fire prevention, security, and other essential systems can be incredibly complex. As a result, these intricate projects often require careful planning, innovation, and collaboration with multiple general contractors and subcontractors. 

In order to meet a tight timeline for constructing a data center, we chose Touchplan, a cloud-based platform, as our primary planning software for this project.

“This was a fast-paced project with a very large team, and getting all the information to all the trade partners was critical. Because you can’t do this kind of project with old-fashioned trade stacking, everybody’s got to have their own space and allocations of time. But it’s also all about managing a very complicated workflow.  Touchplan is a great tool for that because everybody sees the flow and has ownership and buy-in for planning and execution. The ownership happened quickly after we got everybody used to the software and understanding what we were trying to do.”

—Chace Larson, Senior Superintendent

Learn more about how we’re using Touchplan in their case study.

Powering AI’s demand for data centers

January 24, 2025

Construction workers in safety gear stand in front large screens that display project plans on a wall.

Market insights: Power plays

January 13, 2025

Aerial view of AT4 Data Center in Atlanta, GA, showing cranes lifting equipment onto the building.

New Schneider Electric manufacturing facility marks construction milestone

January 17, 2024

An aerial view of a building under construction. An American flag is attached to the side of the building, and dozens of construction workers in personal protective equipment are gathered in front of white event tents.