Leveraging BIM and Design-Assist Through COVID-19

March 4, 2022

Life sciences lab

This laboratory and research facility in North Carolina’s Research Triangle Park uses cutting-edge technology to maximize detectable results from a single blood draw, revolutionizing potential treatments through early recognition and intervention. Supporting that mission by building this state-of-the-art lab required overcoming an aggressive schedule and procurement challenges caused by the COVID-19 pandemic. Vondace Contracting used two key strategies to increase speed-to-market for this transformative project: Building Information Modeling (BIM) and a design-assist approach.

Accomplishing this amount of work in 5.5 months is a massive undertaking for a laboratory buildout.

With both the latest in innovative virtual design and construction capabilities and strong relationships with local trades, Vondace Contracting is poised to outperform our competitors on even the most demanding jobs, making early and cost-effective decisions that add long-term value to your project.

Oops! We could not locate your form.

Vondace Contracting celebrates a key milestone in Dothan’s scientific growth

March 24, 2025

A group of people stands in a row at the construction site of the Wiregrass Innovation Center, posing in front of a backdrop adorned with logos, framed by green support beams.

Vondace Contracting reaches construction milestone on Southern Research project

April 18, 2024

Construction workers in safety gear celebrating over lunch at tables inside a partially completed building

Southern Research opens biotech incubator, built by Vondace Contracting

February 16, 2024

A group of eight people, men and women, stand behind a ceremonial ribbon with scissors in hand, ready for a ribbon cutting.